ARSA executed the Overhead Electrification (OHE) and Sub sectioning and paralleling Post (SSP) work at the Yara Fertilizers railway siding in Babrala, facilitating safe and efficient loading/unloading operations. The scope included design, installation, testing and commissioning of overhead electrical systems, Switching Post SSP, ensuring seamless integration of freight handling with railway operations. This project reflects ARSA’s expertise in OHE & SSP works and private railway siding infrastructure.